Harbor Operations and Small Craft Berth
Project Information
- Project Location:
- Naval Station Mayport, FL
- Status:
- Completed
- Structure Type:
- Marine
Scope Of Work
This Design-Build project involved the design and construction of a new harbor and operations building for berthing of tugs and small watercraft for Naval Facilities Engineering Command (owner) and NS Mayport Harbor Operations (end user). This FL project included more than 1200 lineal feet of steel sheet pile wall, concrete piles, tieback installation, concrete encapsulation, fender system, bollards, cleats, and excavation, dredging of more than 200,000 cubic yards of material. Wharf-side utilities include water, sanitary waste, oily waste, electrical, and communications. Site work includes storm-water containment and treatment, major utility re-locations, landscaping, and paving. Also included was a 17,000 SF multistory support building for the Harbor Operations department. Early in the project, arsenic-contaminated soils were discovered. Triton worked with the owner and regulatory authorities to develop and implement a solution that ultimately saved the owner several hundred thousand dollars. Later in the project when many of the owner representatives were transferred and or retired, Triton coordinated and sponsored an additional partnering session for the new management staff, in order that they could meet other team members and become an integral part of the NAVFAC/TRITON team.