Featured Project Return to Projects List

Andrews AFB Mission Support Facility

Project Information

Project Location:
Andrews, MD
Status:
Completed
Structure Type:
Airport Runway

References

Architect:
Aviation & Facilities Group, Burns & McDonnell

Scope Of Work

The project involved the extension of the existing Type III Hydrant Fueling System to the new Presidential Hanger for Air Force-1.

MEB installed approximately 2,400 LF of 12” lined carbon steel fuel piping to two new hydrant pits on the apron. A new isolation valve vault with a rolling pit cover was installed at the new-to-existing interface point. A new E-stop connection was established and linked with the fuel system control panel. Cathodic protection was installed along the pipeline route and several high and low point pits placed to facilitate system draining and venting. The piping was run under an existing roadway that was repaved at the completion of the work.

Share URL copied!
https://www.thebluebook.com/iProView/359038/meb-general-contractors-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.